Hollywood Boulevard Road Construction Is Underway

Hollywood Blvd contruction (1)

According to Florida Department of Transportation, Hollywood Boulevard is going to change a lot. The road construction affects the part of East Hollywood Boulevard, from the City Hall Circle to the Dixie Highway.

The work should be done in Summer 2019. Florida Department of Transportation has a big plan for this road. It includes:

“removing old asphalt, resurfacing the roadway, adding decorative lighting, widening sidewalks and adding decorative pattern, upgrading existing pedestrian signals to countdown timers, constructing new median with parallel parking, replacing the existing water main and connections at various cross streets, and upgrading signs and pavement markings to reflect the new roadway configuration as follows: two lanes in each direction throughout the entire corridor, a four-foot bike lane in each direction separated by a two-foot buffer throughout the entire corridor.”

When driving in the area, please be carefull and watch for construction people and vehicles.

And please, no speeding.

Hollywood Blvd contruction (2)

Hollywood Blvd contruction (3)